사업실적
Oil & Gas Production Facilities
- Jackets and Topsides for Platform
- Deck Module sub-structure for FPSO & TLP
- SKID Package
- Bridge & Flare Boom Structures
- PLEMS and Subsea Structures
- Turret Structures
Wind Farm Foundation Structures
- Jackets and Piles
- Tripod Structures
- Mono-piles and Transition Pieces

-
S-OIL RUG PROJECT PACKAGE #A3 MODULE PAR-01∼05
Client DAELIM Project S-OIL RUG PROJECT PACKAGE #A3 MODULE PAR-01∼05 Dimension (L) 128.8m X (B) 12m X (H) 38.62m Weight 3,608.7 ton Sail-away 10th ∼ 17th March, 2017 -
Catcher FPSO FTB
Client IHI / BW Offshore / Premier Oil Project CATCHER FPSO FTB Project Dimension (L)110.5m X (B)50m X (H)40m Weight 15,000 MT Load-out June. 23. 2016 Sail-away June. 26. 2016 -
Ichthys M06 MEG Module
Client INPEX/DSME Dimension L37 x B23 Weight Approx. 4,200 (Incl. Piping, E&I Installation) Class DNV Scope Fabrication of MEG Module Construction Period May. 2015 ~ Apr. 2016 Sail-away April. 28. 2016 -
Egina Pipe Rack Module
Client TOTAL/SHI Project EGINA FPSO PIPE RACK Project Dimension H2C: (L)32.4m X (W)6.8m X (H)24m(413ton)
H2D: (L)37m X (W)6.8m X (H)25.4m(551ton)
H2G: (L)32.6m X (W)6.8m X (H)24m(430ton)
H2 : (L)35.5m X (W)6.8m X (H)24m(419ton)Weight 1,813 MT Class DNV Scope Fabrication of Pipe Rack Module Construction Period Jul 2015 ~ Jun 2016 Sail-away July. 6. 2016 -
PFLNG2 Flare Derrick Module
Client JGC Scope Engineering, Procurement and Construction (EPC) of PFLNG2 Flare Derrick Module Weight 1,747 MT Construction Period Apr. 2015 ~ Dec. 2016 -
Jangkrik FPU
Client ENI / HHI Scope Cutting, Assembly, Painting, Outfitting, P.E, and Transportation of Forward Ship Block Weight 4,352 MT Construction Period Mar. 2015 ~ Sep. 2015 Load out Dec. 24. 2015 -
Badamyar
Client TOTAL E&P Myanmar / HHI Scope LCP Jacket and Piles, WHP4 Jacket and Piles & Bridge Jacket Weight 8,829 MT Construction Period Mar. 2015 ~ Jan. 2016 Load out Jan. 17. 2016 -
Catcher FPSO MMB
Client BW Offshore / IHI Weight 19,795 MT Scope Fabrication of MMB (Middle Mega-Block) and FTB (Fore Terra Block) Load-out Dec. 8. 2015 -
Shell Prelude FLNG
Client Shell / SHI Dimension 55M x 50M x 42M Weight 900 MT Class Lloyd Scope M6 Turret Gantry Structure Construction Period Jan. 2014 ~ Dec. 2014 -
Booster Compression
Client Carigali HESS / HHI Dimension 48M x 48M x 55.4M Weight Jacket 6,304 MT / Piles 3,847 MT Construction Period Oct. 2013 ~ Jan. 2015 -
lchthys FPSO Driven Pile
Client INPEX / DSME / SHI Dimension OD 5,500 x L 63,600 Weight 16,140 MT(460 MT each) Section Quantity 37 Driven Piles -
Ichthys FPSO Turret BSS
Client INPEX / DSME Dimension OD 22,000 x H 6,450 Weight 445 MT Construction Period Oct. 2013 ~ May. 2014 -
Ichthys CPF
Client INPEX / SHI Section Pontoon Block Weight 3,100 MT Dimension 50M x 27M x 12M Construction Period Apr. 2013 ~ Feb. 2014 -
P2045, P2046 and P2053
Client PPL Shipyard Singapore Section 10 Living Quarter Blocks, 6 Wing Tank
Blocks and 2 Leg Well BlocksWeight Total 18 blocks: 2,070 MT -
Bigfoot TLP
Client Chevron / DSME Weight 4,635 MT Dimension 120M x 120M x 65M Section Pontoon Block and Top Frame fabrication -
OFON 2 T&I
Owner Technip Weight 3,800 MT Construction Schedule Jul. 2011 ~ Sep. 2012 Section Substructure and grillage for modification and refurbishment -
3MW 해상풍력발전 하부구조물 제작공사
Owner 두산중공업 Construction Schedule 2011년 1월 ~ 2011년 4월 Section JACKET (PIN PILE포함), DECK 6기 -
RongDoi(Vietnam) PLEM
Owner KNOC / HHI Weight 210 MT Construction Period Nov. 2006 ~ Dec. 2006